Quality control
AQL inspection explained: sample sizes, defect limits and a QC checklist
Short answer
AQL (acceptable quality limit) is the most defects a batch can have and still pass inspection. The inspector checks a random sample sized by the lot, counts defects by severity and compares them with the limits for the AQL you chose. Many buyers use 0 for critical defects, 2.5 for major and 4.0 for minor.

Liam Cai · Founder, Supplymo
Six years sourcing out of Yiwu, after five years building software.
Updated

What AQL means
Nobody checks every unit of a 5,000-piece order. AQL sampling, based on the ISO 2859-1 standard, tells the inspector how many units to pull at random and how many defects are allowed before the batch fails.
Defects fall into classes by how much harm they do. Critical defects can hurt someone or break the law. Major defects make the product unsellable or likely to be returned. Minor defects are cosmetic and a customer might not notice them.
AQL 2.5 does not mean 2.5% of your batch is defective. It is the defect level the sampling plan is built to accept most of the time. A batch that passes can still hold some bad units, because the inspector only sees the sample.
Critical, major and minor defects
Swipe sideways to see every column →
| Class | What it means | Examples |
|---|---|---|
| Critical | Could hurt a user or break the law | Exposed wire on a charger, or a missing warning label your market requires |
| Major | Likely to be returned or unsellable | A broken lid or peeling print |
| Minor | Cosmetic only | A faint scratch on a hidden side or a loose thread |
Write the defect list for your own product. A generic list misses the problem that matters most for your goods, such as a lid that must seal or a print color that has to match your brand.
How to read the sampling table
Under general inspection level II (the most common setting) the lot size gives a code letter, and the code letter gives the sample size. The table shows common lot sizes for small and mid-sized orders.
Swipe sideways to see every column →
| Lot size | Code | Sample size | AQL 2.5 major: pass / fail | AQL 4.0 minor: pass / fail |
|---|---|---|---|---|
| 281 to 500 | H | 50 units | 3 or fewer / 4 or more | 5 or fewer / 6 or more |
| 501 to 1,200 | J | 80 units | 5 or fewer / 6 or more | 7 or fewer / 8 or more |
| 1,201 to 3,200 | K | 125 units | 7 or fewer / 8 or more | 10 or fewer / 11 or more |
| 3,201 to 10,000 | L | 200 units | 10 or fewer / 11 or more | 14 or fewer / 15 or more |
Read it like this. For a lot of 1,000 units the inspector pulls 80 at random. With 5 major defects or fewer the batch passes on majors. At 6 or more it fails. Minor defects are counted separately against their own limit, and one critical defect fails the lot.
The sample should come from cartons spread across the whole lot. Units from the top of the first pallet are the ones most likely to have been checked already by the factory.
Inspection levels I, II and III
The inspection level sets how big the sample is for each lot size. General level II is the default and the one most inspection companies quote. Level I uses a smaller sample and suits cheap, simple goods from a supplier you already trust. Level III uses a bigger sample for goods where a miss is expensive.
Special levels S-1 to S-4 use very small samples. They are meant for tests that destroy the unit or take a long time, such as a drop test or a wash test.
Which AQL level to choose
- Critical defects: 0. One critical defect fails the batch.
- Major defects: 2.5 for most consumer goods, 1.5 for higher-value items.
- Minor defects: 4.0 for most goods.
A lower AQL number is stricter. AQL 1.5 allows fewer defects in the same sample than AQL 2.5 does.
Stricter limits mean more failed batches and more re-inspections. Set them to match what a return costs you. A $2 accessory and a $60 appliance should not use the same limits.
When to inspect
- Before production: check raw materials and the first units off the line. Useful for custom goods and new suppliers.
- During production: check once part of the order is made, early enough to fix a problem in the rest.
- Pre-shipment: the standard check, done when production is finished and most cartons are packed. Pay the balance after you read the report.
- Container loading: count the cartons and watch them go into the container. Useful if you have had short shipments before.
For 1688 orders the goods usually come to our partner warehouse first. We open and count them there and photograph them against the listing before anything ships. When a factory order needs a full AQL inspection on site, we arrange it and send you the report.
What to send the inspector
An inspector can only check against what you give them. Send these before the inspection date:
- The approved sample, or clear photos of it from every side.
- The spec sheet with materials, sizes and tolerances.
- Your defect list, with the class of each defect.
- Carton marks, barcode files and label artwork.
- Any function test you want, written step by step.
A quality control checklist for orders from China
- Approved sample and written spec: materials, colors, sizes and tolerances.
- Quantity check against the packing list and invoice.
- Visual check of the sampled units against the approved sample.
- Function tests where they apply, such as switches, zips or closures.
- Measurements of key dimensions.
- Packaging, inner packs, carton marks and barcodes.
- Labels and warnings required in your market.
- Photos of everything above, attached to the report.
What to do when a batch fails
A failed report is where the negotiation starts. Don't pay the balance yet. These are the usual options:
- Ask the factory to sort every unit and rework or replace the bad ones, then inspect again.
- Accept the batch with a discount, if the defects are minor and you can live with them.
- Refuse the batch when critical defects show up or rework cannot fix the cause.
- Agree up front who pays for a re-inspection. Many buyers write into the order that the supplier pays if the first inspection fails.
All of this depends on still holding money. A buyer who paid in full before the inspection has little left to bargain with.
What AQL does not cover
AQL sampling checks workmanship and appearance against your spec. It does not prove the product is safe or legal to sell in your market. Lab tests for materials, chemicals or electrical safety are a separate job for an accredited lab.
A passed report is also no promise that every unit is good. It means the defects in the sample stayed under your limits. If our arrival check misses a problem it should have caught, that is on us. We replace or refund the affected units.
Checking the supplier matters as much as checking the goods:
Official sources
Free tool
Look up your AQL sample size
Enter the number of units in your order to see how many the inspector checks and the pass limits at the common AQL levels.
Code letter J. The inspector pulls 80 units at random. Critical defects: 0 accepted.
| AQL | Pass with | Fail at |
|---|---|---|
| 1.5 | 3 or fewer defects | 4 or more |
| 2.5 | 5 or fewer defects | 6 or more |
| 4.0 | 7 or fewer defects | 8 or more |
ISO 2859-1 single sampling, normal inspection, general level II. Use it as a reference. Your inspection company confirms the plan. Need someone to run it? Pre-shipment inspection in China
FAQ
Questions
What does AQL 2.5 mean?
It is the defect limit used to pick the pass and fail numbers for major defects. For a sample of 80 units it allows up to 5 major defects.
Who does AQL inspections in China?
Third-party inspection companies or your sourcing agent. We do arrival checks at our partner warehouse and arrange factory AQL inspections when needed.
Does passing AQL mean there are no defects?
No. It means the defects found in the random sample were within the limits you set. Some defective units can still be in the batch.
What is the difference between AQL 1.5 and AQL 2.5?
Both set pass limits for major defects, and 1.5 is tighter. In an 80-unit sample, 3 major defects is the most that passes at AQL 1.5, against 5 at AQL 2.5.
When should a pre-shipment inspection happen?
When production is complete and most of the order is packed, so the inspector can sample from finished cartons. Pay the balance after you have the report.
Want us to handle this for you?